TIME RECORD AND TRANSCRIBED NOTES FOR RODGER C. WHITE
PROJECT: RONAN/MOSELEY/TITAS GAS T&D CO. LTD. -
BRAMAPUTRA BASIN ENERGY SELF SUFFICIENCY PROJECT
HOURS WORKED (NOT INCLUDING BRAKES)

D# DW DATE HRS-
HR
COMMENTS
1 F 6/18/1993 10.00 CHECK OUT COMPONENTS AND ARRANGE TRIP.
2 S 19 14.00 MEET JH IN STA BARBARA. THEN TO RONAN TO PACK MATERIALS
3 S 20 10.00 LAX - SF / SF TO TOKYO
  M 21   TOKYO - BANKOCK
4 T 22 10.00 BANGKOK-DHAKA - MEET AT TWX-TOUR TITAS - C/O MATERIAL IN STORAGE - THE PACKING CRATE IS PARTIALLY OPEN AT THE BOTTOM AND THE PROTECTIVE PLASTIC IS TORN TO ABOUT 2.5 OR 3FT. I AM INFORMED THAT THE PANEL MUST BE CARRIED TO THE 7TH FLOOR - 8 FLIGHTS OF STAIRS, NARROW, DOWN A HALL AND INTO A SMALL ROOM. NEITHER TWX NOR TITAS GAS POSSES THE RESOURCES TO TRANSPORT THE PANEL IN ONE PIECE. PLAN DISASSEMBLY STRATEGY AND PREPARE DIRECTIONS.
5 W 23 10.00 UNPACK, DISASSEMBLE, MOVE, RE-ASSEMBLE AND INSTALL ALARM PANEL AT TITAS OFFICE (SEE PICS) THE CABINET RECEIVED SEVERAL SCRATCHES IN THE MOVE. DISPLAY, RACKS, AND MODULES ALL APPEARED OK AFTER THE MOVE. POWER SUPPLY NOT OPERATING. POWER TO PANEL NOT WIRED - IE. NO LINE FROM PS TO PANEL. COMPUTER 110-220 SWITCHABLE. MONITOR 110 ONLY. NEED TWO BAYONET TYPE PLUG CONVERTERS AND A 110-220 CONVERTER. CHECKED POWER SUPPLY ON PORTABLE. NEEDS 110.
6 T 24 8.00 ARRANGE FOR EQUIPMENT - 220-110 CONVERTER, EXTENSION CORD, MULTI PLUG, MEET WITH SHAHIN ISLAM AND TWX TECHNICIANS, ASKED FOR SIGNAL LIST - DIDN'T KNOW WHAT I MEANT. NO KEYBOARD FOR THE COMPUTER NOR ANY SPARE PARTS, NO CABLE TO CONNECT COMPUTER TO MTU.
7 F 25 8.00 LOCATED TWX VARIABLE PS 15V/20AMP - TRIED TO LOCATE SIGNAL LIST FROM CUSTOMER TO BEGIN LABELING THE ALARMS AND PROCESS SIGNALS, SEARCHED FOR MISSING COMPONENTS FROM FEBRUARY SHIPMENT. (SEE NOTES FOR SEPT. 18)
8 S 26 10.00 BEGAN TESTING MTU/RTU'S PREPARATORY TO MOVING RTU'S TO REMOTE LOCATIONS - RECEIVED SIGNAL LIST FROM TWX PROVIDED TO THEM BY THE CUSTOMER. IT APPEARS THAT THE CUSTOMER MAY HAVE 12 PROCESS SIGNALS, WE ONLY PROVIDED FOR 6. NO ONE AVAILABLE TO VERIFY OR CLARIFY. TRIED AGAIN TO SEARCH FOR MISSING SIGNAL LIST. TWX INSISTS THAT NONE WAS RECEIVED. TWX ALSO INSISTS THAT NO SPARES, NO CABINET KEYS, NOR OTHER MATERIALS WERE RECEIVED.
9 S 27 8:00 DC-DC CONVERTER AT TITAS OFFICE IS 12-24VDC, SUPPLY IS 24 VDC. CANNOT TEST PANEL. CONTINUED TESTING RTU'S USING 15V VARIABLE SUPPLY.
10 M 28 12:00 VISITED SHERPUR AT INSISTENCE OF SHAHINUL ISLAM. DAMAGE REPORTED TO TELEMETRY CABINET AND PANEL. LEFT TWX OFFICE FOR SHERPUR AT 10:00 AM - 4.5 HR DRIVE. SWINGING MODULE RACK HAD BECOME UNHINGED DURING SHIPMENT OVER ROUGH ROADS. IT HAD BOUNCED AROUND ABRADING THE EXTRUDED ALUMINUM TRIM AND COVER PLATES, BENDING THE SCREWS AND TEARING THE WIRES ON THE BACK OF THE ALARM PANELS. THE RETAINING BRACKET WAS CRACKED, THE TOP BRACKET WAS LOOSE, AND THE SIDE BRAISES IN THE CABINET WERE BENT. THE CABINET WAS SCRATCHED. TWO OF THE LOGIC RELAYS WERE DESTROYED AND THE ELCO CONNECTORS FROM THE ALARM MODULES TO THE ALARM WERE BENT AND THE CASE OF ONE WAS CRACKED. SEVERAL SCREWS WERE MISSING FROM THE TERMINAL BLOCKS.
1. REMOUNTED SWING RACK.
2. REPAIRED, REBUILT ELCO CONNECTORS, STRAIGHTENED
KEEPER SCREWS AND STRAIN RELIEF. ALL POINTS
EXHIBITED CONTINUITY ON DIGITAL MULTI METER (DMM).
3. STRIPPED, TWISTED, WIRE NUTTED AND TAPED THE
SEVERED WIRES. CONFIRMED CONTINUITY WITH DMM.
4. USED BLANK PANEL SCREWS TO REMOUNT LOOSE
TELEMETRY RACK.
5. USED EXTRA TERMINAL BLOCK (TB) SCREWS TO LAND
SEVERED WIRES.
THE TELEMETRY CABINET SITS BY A WINDOW, NO SHADE. THE METAL TOWARD THE WINDOW WAS QUITE WARM TO THE TOUCH. THERE IS ANOTHER WINDOW ON THE OPPOSITE WALL - ABOUT 6' AWAY. WITH THE WINDOWS OPEN THE CABINET IS ESSENTIALLY OUTSIDE. THE SAME IS TRUE OF THE TERMINATING CABINET FOR THE METERING EQUIPMENT.
THERE WAS NO ELECTRIC POWER AT THE SITE AND NO GENERATOR - ALSO NO RUNNING WATER, THE GUARDS WERE COOKING WITH WOOD ON THE FLOOR AND SLEEPING ON THE DESKS AND ON WOODEN PLATFORMS WITH THIN PADS. GOATS AND CATTLE WERE GRAZING IN THE PIPE FIELD. THERE WERE NO SANITARY FACILITIES.
11 T 6/29/2003 6:00 INVENTORIED EQUIPMENT ON HAND - (SEE LIST) MISSING EXTRA LAMPS, SPARE ALARM MODULES, FILTERS, FLASHERS, AND LOGIC UNITS FOR REMOTE SITES. TWX CLAIMS NEVER RECEIVED.
12 W 6/30/2003 11:00 TITAS - STILL NO CONNECTION FROM SYSTEM POWER SUPPLY SO SET UP TEMPORARY POWER SUPPLY USING 15VDC VARIABLE SUPPLY FROM TWX AND TESTED PANEL LIGHTS BY SHORTING EACH LAMP TO COMMON. MYMENSINGH #7 BURNED OUT. REPLACED WITH LAMP FROM THE "KEY" ARRAY. TEMPORARY SUPPLY NOT SUFFICIENT TO LIGHT ALL LAMPS AT ONE TIME NOR TO OPERATE FLASHERS WHEN ALL LIT. IT APPEARS THAT ONE OR MORE FLASHERS WILL NOT WORK IN THE "MASTER" POSITION. EACH ALARM FLASHED AND WENT STEADY @ ACKNOWLEDGE INDIVIDUALLY.
13 T 7/1/2003 9:00 TEST RTU'S AND MTU'S. ONLY TWO WORKED OF THE 6 TESTED. ALL HAD WORKED AT THE FACTORY IN FEBRUARY. NOR THE SPARES I HAD CARRIED, ALL WORKED. PROBLEM WITH RAI? TYPE FAX TO RONAN RE: LIGHT PANEL AND TO WKD RE RAI. (TITAS CLOSED - SOME SORT OF RELIGIOUS HOLIDAY- LONG WEEKEND)
14 F 7/2/2003 4:00 TWX OFFICE CLOSED (HOLIDAY, SABATH) WORK ON CFG CHANGES. NO RESPONSE TO FAXs. TAKE PM OFF - GO TO ZOO.
15 S 7/3/2003 9:50 TEST MTU AND RTUs AT TITAS. 4 RTUs OK, PROBLEM W/ SPARE MTU. SEND 2ND FAX TO WKD RE RAI. PROBLEM WITH CD IN NEW MODEM UNITS.
16 S 7/4/2003 10:00 TWX OFFICE - NO REPLY TO FAXs TITAS- TRACED CIRCUIT ON RAI --- DIAGRAM ON TOP OF RELAY WAS MIRROR IMAGE OF PINOUTS. FIXED WITH CUT AND PATCH. PUT EACH CENTRAL RTU IN PANEL (2,3, & 4) 1 AT A TIME. ALL WORKED. REPAIRES TO OTHER RTUs.
17 M 7/5/2003 12:00 TWX OFFICE - NO REPLY TO FAXs. MEETING WITH JAMAL HAMDANI @ TITAS OFFICE - TEST AND REPAIR RTU'S 3 AND 4. THEY WERE NOT CONNECTED TO THE MTU AT ALL. FIXED THROUGH RAI. ^^^^^MTU RX AND TX REVERSED TO RAI. CORRECTED.
REMOVED EXTRANIOUS WIRES FROM T4 AND T5 ON RTU CHASSIS 1,2, AND 3.
ALL ORIGINAL MODEM BOARDS WORKING FINE. REVISED BOARDS RESPOND TO MTU, MTU HEARS BUT DOES NOT UNDERSTAND IF MORE THAN ONE IN RACK. IF REVISED BOARD IN RACK WITH ORIGINAL, MTU HEARS BOTH BUT ONLY UNDERSTANDS THE NEW BOARD.
WHEN RAI PRESENT, MTU SDI BLINKS IN CONJUNCTION WITH SDO. THIS DOES NOT APPEAR TO AFFECT OPERATION. SPARE MTU, SPARE RTU, AND ORIGINAL RTU NEED TO BE REPAIRED.
CHASSIS NOTES: SCREWS ON RTU CHASSIS 2 AND 3 ARE CORRODED. SCREWS ON THE ALARM CHASSIS AND RTU CHASSIS 1 ARE BRIGHT AND SHINEY. THE CRATE WAS OPEN AND THE PLASTIC COVER TORN TO ABOUT THE SAME HEIGHT.
18 T 7/6/1993 10.25 TITAS OFFICE - CONTINUTE RTU TEST AND REPAIR. CHECK OUT POWER SUPPLY. CAN IT BE CONVERTED TO 24-24. NO!
POWER SUPPLY NEEDED BY TWX. NO POWER AT TITAS. RETURN TO TWX AND TYPE REVISIONS TO OPERATORS MANUAL SPECIFIC TO TITAS SYSTEM.
19 W 7/7/1993 10.50 TWX OFFICE - CONTINUE OPERATORS MANUAL - TRAIN M. NASIMNUL HOQ TO OPERATE SYSTEM AND EDIT CFG FILES - ENTER NAMES OF SIGNALS PROVIDED BY TITAS.
20 T 7/8/1993 10.50 TWX OFFICE - CONTINUE OPERATORS MANUAL - CONTINUE NASIM'S TRAINING. (FINISHED, REREAD AND REVIEW.)
21 F 7/9/1993 3.00 TWX TOOK 24-24 DC-DC CONVERTER FROM BHALUKA FOR THE TITAS CENTRAL. TITAS OFFICE CLOSED - COULD NOT INSTALL P.S. REREAD MANUAL, REVISE
22 S 7/10/1993 11.50 TWX HAS INSTALLED WIRING FROM RADIO TO PANEL AND RAN 24 VDC POWER TO PANEL SOME TIME IN LAST WEEK. I INSTALLED 24-24 CONVERTER FROM BHALUKA. DISCONNECTED OUTPUT. TESTED. 24 VDC IN, 23.7 OUT. RECONNECTED OUTPUT, TESTED PANEL LIGHTS - OK.
DRIVE TO BHALUKA TO REPALCE 24-24 VDC CONVERTER WITH THE 12-14 VDC CONVERTER FROM CENTRAL. OUTPUT FROM POWER SUPPLY TO TELEMETRY CABINET NOT YET CHANGED TO 12 VDC
RETURNED TO TWX OFFICE. CONFERED WITH SHAHADAD HOSSAIN RE. SWITCHING TELEMETRY POWER SUPPLY AT BHALUKA TO 12 VDC.
23 S 11 11.50 BHALUKA - MAI IN J2, MOVE TO J3, INSTALL RTU AND AST. POWER CABLE STILL CONNECTED TO 24VDC, NOT LANDED IN TELEMETRY PANEL. UNPLUGGED ALL MODULES UNTIL POWER CORRECTLY INSTALLED. SUN SHINES IN WINDOW BY PANEL MAKING IT VERY HOT. NO AIR CONDITIONER. INSECTS FILLING CABINET, SPIDER WEBS A PROBLEM. NEED SHADE IN WINDOW, EXTERMINATOR, AIR SO THAT WINDOW CAN BE KEPT CLOSED.
TRISHAL - MOVE MAI FROM J2 TO J3, INSTALL RTU AND AST. 12VDC FROM POWER SUPPLY TO TELEMETRY NOT CONNECTED AT POWER SUPPLY NOR LANDED ON TELEMETRY. NO 120 SERVICE. PROBLEM WITH WINDOW BY CABINET SAME AS BHALUKA.
MYMENSINGH - VERIFIED 24 VDC SUPPLY, 24-24 VDC CONVERTER. JUMPERED FROM SUPPLY CABLE TO CONVERTER. INSTALL RTU AND AST, MOVED RAI TO J3. CHANNELS 2, 3, AND 4 OVERRANGED ON MAI.
TEST ON RONAN PANEL LIT ALL LIGHTS. GETTING DARK. TWX INSITED ON RETURNING TO DHAKA.
REMOVED POWER JUMPER. TWX TO LAND POWER PERMINANTLY.
PROBLEM WITH WINDOW SAME AS AT TRISHAL AND BHALUKA.
24 M 12 11.25 TITAS OFFICE TO PICK UP RTU AND AST FOR ASHUGONJ RAIN HAD LEAKED IN AROUND AIR CONDITIONER - .25" FLOWING UNDER PANEL. 220-110 CONVERTER SURGING? ALSO NEED 220-110 CONVERTER TO OPERATE MONITOR AT TITAS CENTRAL.
TWX OFFICE FOR MEETING
ASHUGONJ - VERIFY 24 VDC POWER - OK
VERIFY RONAN PANEL ALARMS, OK
RTU - SCANNER COMMUNICATION APPEARS OK
AST CH 1-4 OVER RANGE WHEN MAI PRESENT.
( GUARD SLEEPING ON DESK IN TELEMETRY ROOM, RAIN COMMING IN WINDOW BY PANEL, WASH LINE STRUNG BETWEEN TELEMETRY AND METER PANEL WITH WASH DRYING. )
24 M 11 11.25 TITAS OFFICE TO PICK UP RTU AND AST FOR ASHUGONJ. RAIN HAD LEAKED IN AROUND AIR CONDITIONER - 1/4" FLOWING UNDER PANEL. 220-110 CONVERTER SURGING? ALSO NEED 220-110 CONVERTER TO OPERATE MONITOR. BACK TO TWX OFFICE FOR MEETING
ASHUGONJ - VERIFY 24 VDC POWER - OK. VERIFY RONAN PANEL ALARMS, OK RTU - SCANNER COMMUNICATION APPEARS OK. AST CH 1-4 OVER RANGE WHEN MAI PRESENT.
( GUARD SLEEPING ON DESK IN TELEMETRY ROOM, RAIN COMMING IN WINDOW BY PANEL, WASH LINE STRUNG BETWEEN TELEMETRY AND METER PANEL WITH WASH DRYING. )
25 T 13 12.00 TITAS OFFICE - BILL ROBERTS, FROM RADIO COMPANY, CLAIMED READY TO TEST RADIO LINK. NO PROVISION FOR LINKING RADIO TO MTU. RADIO NOT WORKING ANYWAY. DRIVER HAD LEFT, CALLED TWX FOR PU TO CHECK OUT STORAGE FOR SPARES. TRANSPORT DID NOT ARRIVE FOR SOME TIME - 1.5 HOURS. NO ONE WITH KEY FOR STORAGE SO WENT IN SEARCH OF KEYBOARD.
PROCURED KEYBOARD FOR MATRIX COMPUTER.
(NOTE: SPENT A TOTAL OF 2 HOURS WAITING FOR TRANSPORT FROM TWX. THIS HAS BEEN AN ONGOING PROBLEM. THEY ARE SCHEDULED TO ARRIVE AT 8:00 OR 8:30. THEY SHOW ANY TIME BETWEEN 7:30 AND 10:00. THIS MORNING IT WAS ABOUT 9:30. I'M GETTING TICKED. THEY DON'T CALL THEY JUST SHOW UP AND EXPECT ME TO BE WAITING. IF THEY ARE LATE, I GO TO WORK IN MY ROOM AND DO WHAT I CAN UNTIL THEY ARRIVE. MY BLOOD PRESSURE IS VERY HIGH AND I AM VERY IRRITATED. REQUESTS TO TWX ARE IGNORED. DEMANDS RECEIVE A POLITE HEARING BUT NOTHING CHANGES. NO ONE AT TWX UNDERSTANDS HOW THE SYSTEM WORKS NOR ARE THEY PARTICULARLY INTERESTED IN FINDING OUT - WITH THE EXCEPTION OF NASIM.)
(VERY ILL, PROBLEM WITH TEMPER CONTROL.)
26 W 14 11.25 TITAS GAS - TESTED MODULES WHILE WAITING FOR RADIO RADIO NOT OPERATIONAL FOR TELEMETRY. ACTUALLY, THE WHOLE RADIO SYSTEM WAS DOWN DUE TO A FAILURE AT ONE OF THE MICROWAVE SITES.
TWX OFFICE - WORKED ON HOST COMPUTER - IT WOULD NOT BOOT UNDER CONCURRENT DOS. CHEAP KEYBOARD. WOULDN'T WORK WITH KEYBOARD FROM TWX COMPUTER EITHER.
NOTE: WAS TO BE PICKED UP AT 8:30. TWX ARRIVED AT 10:20. WENT TO TWX OFFICE WHERE DISCUSSIONS ABOUT GAS FOR CAR AND OTHER FALDERAL TOOK 30 MINUTES. WAS UNABLE TO START WORK UNTIL ALMOST NOON. I'M PISSED!
27 T 15 11.00 TITAS GAS - PROBLEM IN ANN PANEL. TRACED TO SHORT IN CIRCUIT FROM TEST SWITCH. REMOVED TEST SWITCH. TESTED ALARM MODULES INDIVIDUALLY. ALL WORKED AND FLASER WORKED. NEED NEW SWITCH.
NO POWER OUTLET FOR PANEL. ONLY OUTLET AVAILABE TAKEN BY RADIO CHARGER.
PURCHASED OUTLET ADAPTER AT STADIUM ELECTRONICS MART SO THAT TWO COMPUTERS COULD BE USED AT GUEST HOUSE.
WENT TO STORAGE CONTAINER AT VENTURA AUTO REPAIR TO SEARCH FOR MISSING SPARE PARTS. COULD NOT LOCATE ANY PARTS FOR THIS JOB EXCEPT COMPUTER FOR RADIO SCADA.
TESTED REMAINING RTUs, MTUs AND ASTs. 6 RTUs, 2 MTUs, NOT FUNCTIONAL.
MEETING AT TWX WITH BAHADUR AND ISLAM RE MAINTINANCE. RADIOS STILL NOT OPERATIONAL.
28 F 16 ----- ALL CLOSED ON FRIDAY - ILL, FEVER AND COLD. DAY IN BED RECOUPERATING.
29 S 17 8.00 APPOINTMENT TO BE PICKED UP AT 8:00. CAR ARRIVED AT 9:00 A.M. WAITED 1.5 HOURS AT TWX OFFICE TO GO TO TITAS. ARRIVED AT TITAS AT 10:40. TITAS ENGINEER - ANAMESH CHAKMA - WANTED DEMO.
RADIO STILL NOT FUNCTIONING AND NO CABLE FROM RADIO TO TELEMETRY PANEL - STILL! RADIO TECH HAD NO IDEA HOW TO CONNECT RADIO TO TELEMETRY.
30 S 18 8.00 WORK AT GUEST HOUSE - TRAIN NASIM - OPERATION, TROUBLE SHOOT, CONFIGURATION.
31 M 19 11.00 BHALUKA - SHAHINUL SWITCHED POWER FROM 24 TO 12VDC SUPPLY. VERIFIED 12 VDC AT TELEMETRY CABINET. LANDED POWER. OK.
TRISHAL - SHAHINUL VERIFIED 12 VDC WIRED CORRECTLY AT PS. VERIFIED THAT CORRECT CABLE IN TELEMETRY CABINET. LANDED POWER CABLE. - BUT - NO AC SO COULD NOT CHECK IT OUT.
MYMENSINGH - SHAHINUL VERIFIED 24 VDC AT SUPPLY. VERIFIED 24 VDC AT TELEMETRY CABINET. LANDED POWER. OK.
32 T 20 11.00 VISITED MYMENSINGH, TRISHAL, AND BHALUKA WITH TITAS ENGINEERS - ANAMESH CHAKMA, MR. MAMUD - AND SHAHIN ISLAM. DISCUSSED WHICH SIGNALS WERE TO BE LANDED AND WHERE. WHETHER NO OR NC. TITAS WAS NOT SURE WHICH WERE NO OR NC. NOT AWARE WHERE SIGNALS CAME IN. WOULD GET BACK TO SHAHIN.
TITAS ENGINEERS REQUESTED THAT MODULE LABLES BE WRITTEN ON EACH MODULE. COMPLIED. AGREED TO DO THE SAME AT ALL SIGHTS.
ALARM AST'S OVER-RANGING. TRIED 269 OHM RESISTORS FROM AST T6, T7, T8, T9 TO COMMON. OVER RANGE DISAPPEARED (CONVERTED 4-20mA TO 1-5 VDC.)
REMOVED MAI FOR MODIFICATION.
33 W 21 10.00 TITAS OFFICE - TWX RAN CABLE TO RADIO. LAND CABLE. 3 WIRE CONNCETION. NOT COMMUNICATING ON RADIO. WILL NOT TALK TO REMOTE SITES. TALKS JUST FINE TO LOCAL RTUs. SDI BLINKS WITH SDO. DOES NOT WHEN
RADIO LEADS TO TB3,2 LIFTED. RADIO TECHNITION STILL CANNOT TELL ME HOW TO INTERFACE WITH RADIO. HE SAIS SOMETHING ABOUT NEEDING 4 WIRE CONNECTION. THAT WAS NOT IN SPECS. CHANGE ORDER TO PROVIED 4 WIRE. WILL REQUIRE REWIRE ON RONAN PANEL.
RETURNED TO TWX OFFICE - WENT TO STADIUM ELECTRONICS MARKET - PURCHASED 180 OHM AND 69 OHM RESISTORS TO PRODUCE 249 OHMS - ALSO SOME IN4148 DIODES.
MODIFIED SPARE MAIs WITH RESISTORS - 289 OHMS BETWEEN TERMINALS 6, 7, 8, AND 9 TO TERMINAL 1, COMMON TO CONVERT 4-20mA TO 1-5VDC.
34 T 22 10.50 TITAS OFFICE IN AM - RADIO TECHS STILL DO NOT HAVE THE SCADA RADIO OPERATIONAL NOR CAN THEY GIVE ME AN ANSWER RE THE NECESSITY TO CONVERT TO 4 WIRE FROM THE 3 WIRE PROVIDED.
RETURN TO TWX OFFICE / MODIFY MORE MAIs. TWX WILL BRING IN REST.
35 F 23 8.00 TWX - REPRINT OPERATORS MANUAL. WORK ON FIELD. OPERATORS MANUAL. MASTER WAS DELIVERED TO TWX ON THE 15TH. THEY CANNOT FIND IT. SO REPRINTED.
NOTE: HEART ATTACK AT 7:00 PM. HOSPITAL AT 9:30.
36 S 24 ----- HOSPITAL ICU
37 S 25 ----- HOSPITAL ICU
38 S 26 ----- HOSPITAL MONITOR
39 T 27 4.00 RETURN TO GUEST HOUSE FROM HOSPITAL AT 3:00 P.M. TYPE REPORTS AND WORK ON FIELD MANUAL.
40 W 28 8.00 CONTINUE WORK ON FIELD MANUAL. MEET WITH SHAHINUL ISLAM RE RADIO HOOKUP AND COMPUTER INTERFACE.
41 T 29 8.00 CONTINUE WORK ON FIELD MANUAL. MEET WITH ROBERTS RE RADIO AND HOW TO INTERFACE WITH IT. FINISHED FIELD MANUAL.
42 F 30 9.00 MEET @ TWX - BEGIN CONFIGURATION MANUAL FOR TWX
43 S 31 11.50 MEET @ TWX - TRY MATRIX COMPUTER 1 MORE TIME - WILL NOT BOOT. CONTINUED WORK ON CONFIGURATION MANUAL AT OFFICE AND AT GUEST HOUSE.
44 S 8/1/1993 9.00 TWX OFFICE - BOOT MATRIX UNDER DOS 5.9 - OK WITH DISKETTE. INSTALLED DOS 5.0 ON HARD DISK. NO GO. REFORMATED MATRIX HARD DISK AND REINSTALLED 5.0. STILL NO GO. CONCLUDED MATRIX DEAD FOR ONE REASON OR ANOTHER. CONTINUED WORKING ON CONFIGURATION MANUALS.
45 M 2 9.00 MEET AT TWX - TYPE REPORTS FOR TP AND RONAN - CONTINUE WORK ON CONFIGURATION MANUAL
46 T 3 10.00 PRINT CONFIGURATION MANUAL, CONTINUE WITH MAI MODS
47 W 4 11.00 PROGRAM EEPROM TO TALK ONLY TO BHALUKA.
BHALUKA - RADIO LINK DOES NOT WORK. NO COMMUNICATION ON SCADA CHANNEL. TWX TRIED BUT CANNOT COMMUNICATE WITH OTHER SITES EITHER. RADIO OUT OF SERVICE.
RETURN TO DHAKA, MODIFY MORE MAIs.
48 T 5 9.50 NO RADIO SCADA LINK. TWX AND ROBERTS WORKING ON PROBLEM. SEEMS TO BE IN MONOHORDI OR DEMERA.
RADIO KEY ALWAYS LOW. LIFTED LEAD TO RADIO AND PROBLEM DISAPPEARED. RADIO PERMINANTLY KEYED. TWX AND ROBERTS NOT SURE WHY.
MODIFY MORE MAIs.
49 F 6 6.00 TWX REPORTS RADIO NOT WORKING. NO USE GOING TO TITAS. FINISH MAI MODs. WORK ON BAD UNITS. MAKE MODIFICATIONS TO FIELD MANUAL.
50 S 7 10.00 APPOINTMENT TO BE PICKED UP AT 7:30 A.M. TO GO TO TITAS AND BHALUKA TO WORK ON GETTING SIGNAL THROUGH RADIO THAT TWX REPORTED NOW HAD A SCADA CHANNEL.
CAR ARRIVED AT 10:30, NO CALL. WORKED ON FIELD MANUAL WHILE WAITING FOR CAR. BLOOD PRESSURE HIGH AND ANGER INCREASING.
PROGRAMMED EEPROM TO HIT EACH DSR POINT IN TURN AND LIGHT EACH LIGHT. ALL WORKED OK.
RADIO LINK -
PROGRAMMED EEPROM TO TALK TO CO-LOCATED RTUs AND BHALUKA. MTU TALKED TO CO-LOCATED RTUs BUT RECEIVED NO RESPONSE FROM BHALUKA. DROVE TO BHALUKA.
BHALUKA - NO SDI ON RTU. LIFTED THE RADIO KEY LINE. STILL NO SDI. RETURN TO TITAS CENTRAL.
TITAS CENTRAL - MTU SDI FLASHES WHEN SDO FLASHES. REMOVE RAI. SDI DOES NOT FLASH.
TIED RADIO XMIT LEAD FROM MTU TO CO-LOCATED RTU. WORKED. XMIT IS GOING OUT. NEED A SCOPE. TWX SCOPE STILL NOT WORKING.
RECONNECT TO RADIO, REINSTALL RAI. RTUs WHICH HAD BEEN WORKING QUIT. RTU'S ARE APPARENTLY HEARING THE MTU BUT NOT RESPONDING. LEVEL PROBLEM. SYMPTOMS NOT OBSERVED EARLIER.
WHEN LIFT RADIO KEY LEAD TO RADIO, MTU HEARS RTUs. REATTACHED KEY LEAD. SOMETHING ON RADIO SIDE HOLDING THE KEY HIGH, THEN LETTING IT "FADE" BUT IT NEVER GETS TO 0. LOWERED GAIN IN RAI. MTU UNDERSTANDS RTU RESPONSES.
51 S 8 10.00 TITAS CENTRAL - VERIFIED TX AND RX FROM RAI. TESTED REMAINING RTUs IN TEST RACK. ALL OK.
REVERIFIED TX AND RX THROUGH RAI T13 AND T14. FIX RTU DESIGNATION MIXUP BETWEEN MYMENSINGH AND TARAKANDI. TARAKANDI-17, MYMENSINGH-15.
MAKE A BOOTABLE SCADA DISKETTE TO TEST REPLACEMENT COMPUTER.
CONFER WITH ROBERTS RE RADIO AND RADIO CONNECTIONS TO THE COMPUTER. ROBERTS BELIEVES THAT 4 WIRE MODS ARE NECESSARY. DOESN'T THINK KEY AT CENTRAL NEEDED. APPARENTLY NOT.
RESPOND TO FAX INQUIRY.
52 M 9 12.00 TITAS OFFICE - SDI STILL BLINKS WHEN SDO BLINKS IF RADIO ATTACHED.
SDO DOES NOT BLINK WHEN CO-LOCATED RTU RESPONDS.
SDO BLINKS WITH SDI WHEN REMOTE RTU RESPONDS.
LISTEN TO TX AND RX, CAN HEAR TX ON RX LINE AND RX ON TX LINE.
LIFTED RADIO LEADS. CANNOT HEAR TX ON RX NOR RX ON TX.
CONFER WITH ROBERTS AND SHAHADAD HOSSAIN RE SOLUTIONS LIFT RADIO KEY LEAD TO RADIO. TB3,1 W/B(TX) TB3,2 B/W (RX) TB3,3 NC(RKEY) TB3,4 G/W (COMMON)
PROGRAM EEPROM TO TALK TO BHALUKA, TRISHAL, AND MYMENSINGH.
BHALUKA - CHECK OUT INDIVIDUAL ALARMS BY GROUNDING EACH INPUT. ALL OK.
INSTALL MODIFIED MAI.
SWAP J1 T4 AND T6 - RX AND TX.
RTU HEARING MTU BUT NOT UNDERSTANDING.
DOESN'T UNDERSTAND MESSAGE.
TRISHAL - WIRE MODS, RTU NOT HEARING MTU. CHECK OUT ALARM PANEL. SEE CHECKOUT SHEET.
INSTALL MODIFIED MAI.
MYMENSINGH - SWAP J1 T4 AND T6, INSTALL MODIFIED MAI. 1 DST NOT SENDING DATA.
RAI RADIO KEY ALWAYS ON. REMOVED KEY LINE FROM RADIO.
PROBLEM DISAPPEARED
VERIFIED RADIO TX RED TO TB3,1 - RX GRN TO TB3,2 COM BLU TO TB3,4
.564 VAC FROM DHAKA ON RX LINE, RTU UNDERSTANDS AND RESPONDS. HOORAY
53 T 10 15.00 TRIP TO TITAS AND TO BHALUKA TO CO RADIO. SAME AS ON THE 9TH. DON'T KNOW WHAT WAS DONE WITH THE RADIO BUT IT DIDN'T HELP.
FINISH TYPING AND PRINTING CONFIGURATION MANUAL. MAKE TRAINING OUTLINE, GATHER MATERIALS.
54 W 11 11.00 DELIVER TRAINING MANUAL TO SHAHINUL ISLAM. TITAS- BHALUKA SHUTTLE. STILL NO GO.
PURCHASED "NOVA" COMPUTER FROM "COMPUTERLAND" WITH NO KEYBOARD OR MONITOR. WILL USE THE KEYBOARD TO REPLACE THE MISSING MATRIX ONE. WILL USE ORIG. MONITOR. IT BOOTED CONCURRENT OK. RAN SYSTEM.
55 T 12 11.00 TITAS - BHALUKA SHUTTLE - CAN SEE NO IMPROVEMENT. IT IS NOT APPARANT WHAT CHANGES HAVE BEEN MADE WITH THE RADIO. SYMPTOMS STILL THE SAME.
BLOOD PRESSURE AT 150 /130 EVEN WITH MEDS. ANGRY ALL OF THE TIME.
INFORMED ROBERTS, SHAHADAD THAT I WOULD NOT MAKE THE TRIP AGAIN UNTIL THEY WERE SURE RADIO WAS WORKING.
NASIM PICKED UP COMPUTER, DELIVERED TO GUEST HOUSE.
LOAD SYSTEM AND SUPPORT SOFTWARE IN THE NEW COMPUTER.
DELIVER TRAINING MANUAL TO SHAHINUL ISLAM. TITAS- BHALUKA SHUTTLE. STILL NO GO.
PURCHASED "NOVA" COMPUTER FROM "COMPUTERLAND" WITH NO KEYBOARD OR MONITOR. WILL USE THE KEYBOARD TO REPLACE THE MISSING MATRIX ONE. WILL USE ORIG. MONITOR. IT BOOTED CONCURRENT OK. RAN SYSTEM.
56 F 13 11.00 MET WITH SHAHADAD AND SHAHINUL FOR CONFIG TRAINING. THEY WERE UNFAMILIAR WITH KEYBOARDING AND HAD NO KNOWLEDGE OF DOS - EITHER MS OR CONCURRENT. SHAHADAD COULD NOT TYPE. THEY AGREED THAT THEY HAD INSUFFICIENT BACKGROUND TO PROCEED.
WORKED ON REPAIRING MODULES.
CONFIGURATION FILE CLEAN UP.
57 S 14 10.00 BHALUKA - WITH TITAS RADIO CLASS - MONOHORDI UHF SITE NOT WORKING SO NO SIGNAL FROM DHAKA RETURNED TO GH TO WORK ON MODULES. TRACE DATA PATH THRU RDBs, MDB, HDB.
58 S 15 10.00 DAY TRANSPORT STRIKE, WORK ON REPAIRS IN AM.
PM - TAKE ROBERTS TO NORTHWEST AIRLINES OFFICE TO RESERVE TICKETS HOME. RADIOS NOT LIKELY TO WORK ANY TIME SOON. REWIRED DHAKA FOR 4 WIRE ELIMINATING RAI - AGAIN.
59 M 16 12.00 AM OPERATOR'S CLASS FOR TITAS GAS ENGINEERS. ONLY 2 WERE FAMILIAR WITH KEY BOARD. ONE SEEMED KNOWLEDGEABLE. WORKED WITH TWX AT TITAS CENTRAL ATTEMPTING TO COMMUNICATE ON RADIO. SHAHADAD HOSSAIN AND SHAHINUL ISLAM DISCOVERED THAT THE TX AND RX WERE REVERSED ON THE RADIO - ON ALL RADIOS. REWIRED FOR 3 WIRE COMMUNICATION.
BATTARY DEAD IN NEW COMPUTER, NASIM TOOK TO COMPUTER LAND TO FIX.
60 T 17 15.00 AM OPERATOR'S CLASS FOR TITAS GAS ENGINEERS. PM PROGRAMMED TEST EEPROM TO TALK JUST TO BHALUKA, TRISHAL AND MYMENSINGH.
DROVE TO BHALUKA. RTU LISTEND AND RESPONDED TO THE THE MTU WITH 3 WIRE SETUP.
TRISHAL VHF - NO COMMUNICATION BECAUSE NO POWER.
MYMENSINGH - RTU LISTENED TO MTU AND RESPONDED WITH 3 WIRE SETUP
61 W 18 15.00 AM OPERATOR'S CLASS.
DHAKA TO CONFIRM MTU POLING RTU. INTERMITTANT COMM FAIL FROM SOMEWHERE.
BHALUKA TO CONFIRM RTU STILL WORKING - IT WAS.
TRISHAL - NO POWER, IT WAS LATE AND TO DARK TO WORK.
EVE DHAKA - DISCUSS 3 WIRE VS 4 WIRE WITH JIM NEWSOME FROM DSC AND LARRY MEDLIN FROM AEROTRON IN ORDER FOR THE VHF RADIOS TO WORK AT SPUR SITES, WE NEED 4 WIRE HOOKUP. CONTINUE TRYING TO TRACE DATA PATH THROUGH THE CONFIGURATION FILES.
DESIGN 4 WIRE MODS, ELIMINATING THE RAI.
62 T 19 15.00 AM TITAS ENGINEERS FIELD TRIP TO BHALUKA.
PM CONVERT BHALUKA TO 4 WIRE AND TEST COMM OOPS - NEED TO WIRE DHAKA TO 4 WIRE.
EVE- TYPE OUT 4 WIRE CHANGE DIRECTIONS.
63 F 20 16.00 AM DHAKA W/RADIO ENGINEER JIM NEWSONE. CONVERT TO 4 WIRE.
PM DRIVE 2.5 HRS TO ASHUGONJ, (DC - DC CONVERTER REPORTED DEAD - CHECK IT OUT)
ASHUGONJ - MAKE 4 WIRE MODS AND C/O CONVERTER - IT IS INDEED DEAD - REMOVE CONVERTER AND RETUN IT TO THE GUEST HOUSE. CONFIR W/SHAHINUL ISLAM. DID NOT KNOW THE WORD "VERIFY". REWRITE 4 WIRE CONVERSION DIRECTION WITH SIMPLER VOCABULARY, MORE PICTURES
64 S 21 16.50 AM TWX OFFICE - VHF DRIVER ON NOVA COMPUTER HAVING PROBLEMS - ARRANGE FOR REPAIR
TITAS CENTRAL TO PU COMPUTER AND DELIVER TO BUSINESS LAND. RETURN TO DHAKA, ADJUST LEVEL AND GAIN IN MTU IN CONJUNCTION WITH RADIO TECHS. PU COMPUTER AT B/LAND. MEET WITH JAMAL HAMDANI AND DRIVE TO BHALUKA. RADIO TECH - LARRY MEDLIN FROM AEROTRON ADJUSTED VHF RADIOS. JIM NEWSOME FROM DSC LIKEWISE.
BHALUKA - RTU HEARD MTU AND RESPONDED. DROVE TO TRISHAL.
TRISHAL - CONNECTED KEY WIRE PER J.H. - NO COMMON ATTACHED. COMMON THROUGH POWER SUPPLY. RTU HEARD CENTRAL AND RESPONDED AFTER LOTS OF TINKERING WITH THE RADIOS. NOT SURE WHAT WAS DONE WITH RADIOS. IT DID NOT APPEAR THAT MTU UNDERSTOOD THE RESPONSE FROM THE RTU (I.E. IT POLLED IT SEVERAL TIMES IN A ROW.)
RETURNED TO GUEST HOUSE, PACKED TO DEPART ON 22ND.
65 S 22 14.00 AM TWX OFFICE THEN MEETING WITH J/H. AGREED TO STAY SINCE THERE WAS EVIDENCE THAT THE RADIOS COULD BE MADE TO WORK.
SET UP COMPUTER AT TITAS CENTRAL. INSTALL THE SYSTEM MTU EEPROM. FIX HOST TO ALLOW DIRECT ACCESS TO MTU THROUGH MDBEDIT. IT WORKED FOR ABOUT AN HOUR, THEN QUIT.
EVE. - REVIEWED MTU PROGRAM AND DATA PATH. REVIEWED MDBLIST1 AND 2. TYPED REPORT.
66 M 23 10.00 AM MEET W/JAMAL H. AT SONARGAON. CLASS ON RADIO SYSTEM WITH TROUBLE SHOOTING BY JIM NEWSOME AND LARRY MEDLIN.
PM - TITAS CENTRAL - MODIFY RTU FOR CONSTANT CARRIER - LIFT PIN ON HEX INVERTER. MMDBEDIT WORKING JUST FINE TODAY. NO GLITCHES IN HOST-MTU COMMUNICATION. CONFIGURATION CHANGES PER REQUEST.
67 T 24 16.00 AM REVIEW MTU PROGRAM - CORRECT TYPO AT TARAKANDI.
PM UPDATE CONFIGURATION OF TEXT FILES TO MEET TITAS ENGINEER REQUEST. PRINT FILES FOR CUSTOMER. MOVED SPARES TO GUEST HOUSE - SET UP REPAIR BENCH TO TEST RECALCITRANT SPARES. SPARE ASTs MISSING. WERE IN BOX AT TWX TO BE INSTALLED AT SITES AS TWX WORKED ON RADIOS. THEY HAD NOT DONE THIS AND NO ONE KNOWS WHERE ASTs ARE. THEY CLAIM TO HAVE NEVER SEEN THEM NOR KNOW WHAT THEY ARE.
EVE - WRITE PROGRAM TO BENCH-TEST MTU WITH A PAIR OF RTUs. RTU EEPROM PGRM TO PUT DUMMY DATA OUT TO MTU, LIGHT LEDS. IT WORKED. MTU TOOK IN DATA AND STORED IT IN ALL CORRECTLY.
PM UPDATE CONFIGURATION OF TEXT FILES TO MEET TITAS ENGINEER REQUEST. PRINT FILES FOR CUSTOMER. MOVED SPARES TO GUEST HOUSE - SET UP REPAIR BENCH TO TEST RECALCITRANT SPARES. SPARE ASTs MISSING. WERE IN BOX AT TWX TO BE INSTALLED AT SITES AS TWX WORKED ON RADIOS. THEY HAD NOT DONE THIS AND NO ONE KNOWS WHERE ASTs ARE. THEY CLAIM TO HAVE NEVER SEEN THEM NOR KNOW WHAT THEY ARE.
68 W 25 15.00 AM TITAS CENTRAL TO SET SKIP FLAGS TO COM ONLY WITH BORROWED ASTS TO INSTALL AT REMOTE SITES. DRIVE TO TRISHAL.
TRISHAL - 4 WIRE REWIRE TRISHAL AND DEMONSTRATED FOR NASIM. DRIVE TO MYMENSINGH
MYMENSINGH - NASIM MADE 4 WIRE CHANGES UNDER SUPERVISION. ALL CONNECTIONS CONFIRMED. (RADIOS OUT OF SERVICE. COULD NOT TEST COMMUNICATION.)
MICROWAVE LINK DOWN. BULB OUT AT 2,8. BAD CARD AT 2,11. SWAP IN
CARD FROM 36.
EVENING - PROGRAM SPARE EEPROMS FOR RTUs AND MTUs.
69 T 26 16.75 ALL DAY - JAMALPUR AND TARAKANDI.
JAMALPUR - REPAIR SHIPPING DAMAGE - RACK HAD BROKEN LOOSE AND WAS LEANING IN THE BACK OF THE CABINET. TOP "SHACKLE" HAD BROKEN. JURY-RIGGED REPAIRS.
CATALOG OF DAMAGE -
ELCO CONNECTORS BENT.
BACK PANEL ABBRADED.
CABINET DOOR SCRAPED WITH SOME GOUGES.
WHITE PLASTER RESIDUE ON LIGHT COVERS
SOME OF THE HANDELS WERE BENT.
VERIFY POWER CABLE. CABLE TO INSTRUMENT CABINET INSTALLED INSTEAD OF THE POWER CABLE. LOOSE CABLE CARRYING 13.7 VDC LYING IN BOTTOM OF CABINET. TURNED OFF POWER AT THE POWER SUPPLY. CORRECTED THE POWER HOOKUP.
CHECKED LIGHTS. SEVERAL HAD BROKEN AND THE CLIPS WHICH HELD THEM HAD BROKEN. USED UNUSED POINTS TO REPLACE THE POINTS IN USE - MODIFIED CLIPS TO HOLD BULBS IN PROPER POSITION.
FIXED J1 T4 AND T6 WIRE SWAP, REMOVED RAI AND DID 4 WIRE MODS.
J7, T15 - J7, T4 = RX1
J7, T16 - J7, T3 = RX2
J7, T13 - J7, T6 = TX1
J7, T14 - J7, T5 = TX2
NO WIRE AVAILABLE TO CONNECT RADIO KEY. RADIO NOT OPERATIVE ANYWAY - NO INFORMATION AS TO WHY NOT BUT IT WOULD NOT OPERATE.
LANDED LEADS FROM THE RADIO.
TWX HAD NOT INSTALLED RTU, AST, NOR MAI AT THIS SITE.

TARAKANDI -
RACK LOOSE IN CABINET, ELCO CONNECTORS HAD SCORED THE BACK OF THE CABINET. SOME GOUGES IN THE DOOR. PUT RACK IN PLACE. CHECK FOR DAMAGE WHICH MIGHT CAUSE OPERATIONAL PROBLEMS. THERE SEEMES TO BE NONE.
VERIFY POWER SUPPLY AND DC-DC CONVERTER. 27.5 VDC FROM PS - 23.7 VDC OUT OF CONVERTER (24VDC). TEST ALARMS- BAD CARD AT 11, SWAPPED WITH CARD IN 36. REPLACED BROKEN BULBS WITH ONES FROM SPARE ALARMS. FIXED BROKEN CLIPS. ALL OK AFTER REPAIR.
NOTE: WAXY BLUE/GREEN GOO ON J1-EVEN SCREWS, LESS ON J1-ODD SCREWS, LESS ON J2-EVEN SCREWS AND JUST A LITTLE ON J2 ODD SCREWS. J3 ON ALL ARE BRIGHT AND SHINEY.
(NOTE: FLAT TIRE ON THE WAY HOME, IN THE DARK, ON A BACK ROAD. REPAIRMAN AT NEXT VILLAGE BURNED A HOLE IN THE TUBE.)
JAMALPUR - REPAIR SHIPPING DAMAGE - RACK HAD BROKEN LOOSE AND WAS LEANING IN THE BACK OF THE CABINET. TOP "SHACKLE" HAD BROKEN. JURY-RIGGED REPAIRS.
70 F 27 15.00 AM AT TWX SPOKE TO SHAHINUL - HE WILL DILIVER RTUs, ASTs, AND MODIFIED MAIs TO JAMALPUR AND TARAKANDI. WHILE WAITING I SNOOPED AROUND THE TWX BACK ROOM. FOUND A BOX WITH THE MISSING ALARM AND LOGIC CARDS, TWO CALIBRATORS, THE COMPUTER-MTU CABLE, 100 SPARE ALARM BULBS. (HOW ABOUT THAT? ALL OF THE STUFF TWX SAID THEY HADN'T RECEIVED AND WHICH I SPENT A DAY AND A HALF SEARCHING FOR.)
GAFFARGAON
CHECK POWER SUPPLY AND CONVERTER - OK.
INSTALL RTU, AST AND MAI.
CHECK ALARM PANEL -
TWO BULBS BROKEN. REPLACE WITH SPARE BULBS. REPAIR CLIPS
NASIM - MAKE 4 WIRE MODS AT J7, FIX J1 T4,T6. VERIFY CONNECTIONS -OK
LAND RADIO CABLE IN TELEM CABINET. RADIO TURNED OFF. NOT CLEAR WHY. NO RESPONSE WHEN TURNED RADIO ON AND TRIED TO CALL DHAKA. RAN WIRE FOR RADIO KEY.
(NOTE: BUS BLOCKING ROAD, STUCK IN MUD. GOT OUT TO PUSH, BUS MOVED, DRIVER GOT BACK IN AND LEFT. WALKED ABOUT 3 KM UNTIL COULD CATCH THE NEXT BUS.)
71 S 28 14.00 NETROKONA -
CHECK POWER SUPPLY - AC SERVICE HAD BEEN OFF FOR A NUMBER OF DAYS. BATTERIES HAD RUN LOW. NO GENERATOR TO CHARGE BATTERIES. POWER SUPPLY ONLY PUTTING OUT 10VDC. CONECTED POWER TO DC-DC CVTR. 10 VDC IN - 23.7 VDC OUT.
4 WIRE MODS AND RADIO KEY WIRE.
POWER BACK / TURNED ON. CONTINUE POWER SUPPLY CHECK. CHECKED POWER SUPPLY - 11.3VDC OUTPUT TO CONVERTER CONVERTER OUTPUT = 23.7VDC.
TWX HAD PREVIOUSLY WIRED INSTRUMENT CABINET TO TELEMETRY CABINET - CONNECTIONS 1-12. NO POWER TO INSTRUMENT CABINET. 1-12 WERE STRAPPED NC. ANN CARDS SET UP FOR NO. AGREEMENT WAS FOR ALL INPUTS TO BE NO. TWX WILL CHECK IT OUT.
SOME ANN CARDS DID NOT SOUND HORN IN A REASONABLE TIME, TWEEKED UNTIL DELAY ABOUT 10SEC.
REPLACED BURNED OUT BULBS AND REPAIRED BROKEN CLIPS.
FLASHER CARD IN ALARM RACK 2 WOULD NOT WORK AS EITHER MASTER OR SLAVE. PUT ORIGINAL MASTER BACK. 1-24 FLASH. 23-36 NOT USED. NEED TO PUT IN A SPARE FLASHER AT RACK 2
72 S 29 15.00 AM - KILLED ANOTHER 2 HOURS WAITING AT TWX.
KISHORGONG -
NO AC SERVICE AND NO GENERATOR. BATTERIES LOW
VERIFY THE 12VDC CABLE AND LAND WIRES ON THE
DC-DC CONVERTER. NOT ENOUGH POWER TO CONDUCT ALARM TEST.
REWIRE FOR 4 WIRE, LAND WIRES FOR TX AND RX FROM RADIO.
NOT SURE WHAT IS GOING ON WITH THE RADIO BUT CABLE NOT PULLED ALL OF THE WAY TO THE RADIO. IT IS COILED IN THE OVERHEAD TRACK.
INSTALL ONLY KEY LINE UNTIL CERTAIN WHAT IS UP WITH THE RADIO.
(8 HOURS ON THE ROAD, 2 HOURS AT TWX. 10 HOURS OF WASTED TIME!!)
NO AC SERVICE AND NO GENERATOR. BATTERIES LOW.
73 M 30 15.00 AM - MEET AT TWX - GO TO STADIUM TO PURCHASE SUPPLIES - DIODES.
TRISHAL - TEST RADIO - NO POWER & NO GENERATOR.
HAD BEEN ASSURED BY TWX THAT EVERYTHING AT TRISHAL WAS WORKING BEFORE WE LEFT. TYPICAL.
PM-EVE - REPAIR UNITS ON BENCH. SPARE MTU, AND 2 RTUs RESURECTED.
74 T 31 16.00 SHERPUR -
CHECK POWER SUPPLY - 12VDC OUTPUT.
DC-DC CONVERTER - 23.4 VDC OUTPUT.
MAKE 4 WIRE MODIFICATIONS, J1,T4 AND J1,T6 CORRECT.
LAND CABLE FROM RADIO.
ALARM CHECK -
MOVED RELAY FROM GROUP TO GROUP SINCE ONLY 1 RELAY IN PANEL - NO SPARE RELAYS.
REPLACED BROKEN BULBS AND FIXED BROKEN CLIPS.
REPLACED BAD ALARM CARD AT 10
REMOVED DC-DC CONVERTER TO TAKE TO ASHUGHOJ.
TRISHAL - INSTALLED RADIO KEY LINE
MYMENSINGH - REPLACED MISSING ALARM CARD
EVE - CONTINUE TO REPAIR MODULES
75 W 9/1/1993 8.00 AM-PM - CONTINUE TO REPAIR MODULES
SEVERE CHEST PAIN!
HAD TICKET TO RETURN TO U.S. AGREED TO STAY SINCE LARRY AND JIM ASSURED ME THAT THEY WOULD HAVE THE RADIOS OPERATING IN A WEEK. ANYWAY, TOO MUCH PAIN TO TRAVEL.
76 T 2 14.00 TWX ARRIVED AT ABOUT 10 - INVENTORY MODULES WHILE WAITING.

ASHUGONJ -
INSTALL 12-24 CONVERTER BORROWED FROM SHERPUR.
CHECK OUT OK - 12VDC IN, 23.7 OUT. ALARMS STILL WORK.
LANDED WIRES TO TELEMETRY.
SET RTU TX LEVEL TO .772 VAC PER LARRY MEDLIN.
NO INPUT OR OUTPUT SIGNAL AT TELEMETRY CABINET.
CHECKED IN RADIO ROOM. TELEMETRY CABLE LIFTED. NOT CONNECTED TO RADIO. CHANNEL BEING USED TO TEST ANOTHER UHF STATION. CANNOT TEST SCADA LINK.

MONOHORDE -
PICK UP UHF RECEIVER FOR JIM NEWSOME. MET WITH JIM AND LARRY AT SONARGAON.
77 F 3 12.00 AM-PM - REPAIR MODULES, SORT OUT COMPATABLE MTUCOMM AND MDBLIST COMPATABILITY.
78 S 4 14.00 MYMENSINGH -
LEVEL INPUT AT 0db. OUTPUT AT .333VAC - WOULD NOT CHANGE WHEN TWEEKED LEVEL POT. CALLED JIM AT BHALUKA. TX AND RX SWITCHED AT PUNCH BLOCK. I CHANGED THEM IN TELEMETRY CABINET SINCE IT WAS MUCH EASIER THAN AT RADIO. NOTE: COLOR SCHEME FOR RADIO CABLE AGREED UPON WITH SHAHADAD HOSSAIN WAS:

TX1=RED
TX2=GREEN
RX1=YELLOW
RX2=BLUE OR BLACK.

THIS SCHEME HAS NOT - NOT!! - BEEN FOLLOWED AT ANY SITE. THE WIRES HAVE BEEN LANDED ON THE PUNCH BLOCK IN ANY ORDER, WITHOUT REGARD TO COLOR. IT IS IMPOSSIBEL TO TELL WHICH IS TX AND WHICH IS RX WITHOUT CHECKING THE INPUT ON THE PUNCH BLOCK. IN SOME CASES, THE PUNCH BLOCK HAS BEEN INCORRECTLY WIRED TO THE RADIO SO THERE IS NO WAY TO TELL WHICH IS TX, WHICH IS RX, WHICH IS E, NOR WHICH IS M. CD AND SDI OK.CONTINUED ON PAGE 20

AGREED WITH JIM NEWSOME TO SET RTU OUTPUT AT .25VAC. ANY OTHER ADJUSTMENT DONE THROUGH UHF AT BHALUKA. (RADIO PEOPLE TO TAKE CARE OF LEVELS AFTER RTU LEVEL SET. RADIOS HAVE SEVERAL CONTROLS WHERE THIS CAN BE ACCOMPLISHED.)
79 S 5 16.00 DHAKA - SET MTU TO TALK TO MYMENSINGH AND TARAKANDI. DRIVE TO MYMENSINGH.

MYMENSINGH - RTU RESPONDED TO MTU AND MTU WENT ON POLING OTHER SITES IN THE LOOP. APPEARED TO BE WORKING. WITH JIM AND LARRY, SET LEVEL AT .25 VAC AGAIN - WITH 600 OHM RESISTANCE AT BRIDGE. DRIVE TO TARAKANDI -

TARAKANDI - WIRES FROM RADIO TO PUNCH BLOCK IN WRONG
POSITION. FIXED WITH DIRECTION FROM JIM NEWSOME BY PHONE.
RTU WAS INSTALLED BY SHAHINUL ISLAM. SHUNTED TO BE STATION 15. CHANGED TO STATION 17 PER STATION PLAN.
RTU IN RACK NOT SCANNING ALL SCANNERS. REPLACED WITH A SPARE - OK.
TURNED ON CONSTANT CARRIER, SET OUTPUT TO .25 VAC WITH 600 OHM ATTENUATION AT BRIDGE PER AGREEMENT W/JIM NEWSOME.
MAI CHANNEL 1-4 OVERRANGING. DISCOVERED COLD SOLDER JOINT. REPAIRED. OK
RTU HEARD THE MTU BUT DID NOT RESPOND. NO BAD MSG LED.
TALKED TO DHAKA ON RADIO PHN. POWER HAD GONE OUT. MTU RESET.
80 M 6 15.50 DHAKA - NO REMOTE RESPONDING. SET SKIP FLAGS TO JUST POLL JAMALPUR AND TARAKANDI
DRIVE TO JAMALPUR - 4.5 HOURS - MID AFTERNOON.

JAMALPUR -
RX AND TX NOT LANDED CORRECTLY. FIXED PER AGREEMENT WITH TWX (I.E. RED=TX1, GREEN=TX2, YELLOW=RX1, BLUE =RX2)
TURNED ON RTU CARRIER AND SET OUTPUT LEVEL TO .25VAC WITH 600 OHM LOAD PER AGREEMENT WITH JIM NEWSOME.
CHECKED OUT SCANNERS - RTU HITTING THEM ALL.
RAN GREEN AND WHITE PAIR FOR RADIO KEY TO TB3.
ATTACHED TEMPORARY KEY WIRE TO GREEN AND WHITE PAIR AND RAN WIRE TO E-LEAD ON VHF RADIO PER LARRY MEDLIN.
ADJUSTED LEVELS PER LARRY'S INSTRUCTIONS OVER THE RADIO PHONE. RAISED RTU OUTPUT TO 0DB PER LARRY.
RTU LISTENED AND RESPONDED DURING TEST WITH BOTH MANUAL KEYING AT THE RADIO AND WITH KEYING FROM THE RTU. E LEAD TO COMMON WHEN RADIO KEYS - OK.
SET MODEM CARRIER ONLY WHEN TX.
81 T 7 14.50 AM-TITAS, SET SKIP FLAGS FOR MTU TO ONLY POLE SHERPUR. STOP AT TWX - 1 HR. DRIVE TO SHERPUR 4.5 HOURS.
SHERPUR - RUN RADIO KEY WIRE AND RADIO COMMON WIRE.
VERIFY TX AND RX WIRES CORRECT. RADIO CREW ADJUSTING THE RADIO. IT WAS NOT WORKING. WENT IN TELEMETRY ROOM TO MAKE NOTES. RADIO CREW AT TARAKANDI LEFT WITHOUT TELLING ME AND WITHOUT CHECKING OUT SCADA RADIO LINK.
(9 HOUR ON THE ROAD PLUS WAITING AROUND FOR 2 HOURS TO ACCOMPLISH NOTHING!!! TOTAL 14.5 HOURS.)
82 W 8 10.00 REPAIRS TO RTUS AND MTU. SPARE MTU STOPPED WORKING. RESURECTED. RTUS STOPPED WORKING. RESURECTED 2.
83 T 9 10.50 REPAIRED AST. ANOTHER RTU. COULD NOT FIND THE FAULT IN THE DST.
84 F 10 10.00 AM - TITAS OFFICE TO CHECK MTU COMMUNICATION. RADIOS DOWN. NOTHING WAS WORKING.
PM - MEET BILL AT AIRPORT. GO TO TWX OFFICE AND HOTEL
85 S 11 10.75 AM - MEET AT TITAS OFFICE, GO OVER SETUP
PM - WORK ON REWORK OF CONFIGURATION FILES AND EXPLAIN CHANGES REQUESTED BY TITAS.
86 S 12 10.00 CONTINUED REPAIRS TO MODULES WHICH HAD DIED DURING PREVIOUS 3 MONTHS. MAKE PLAN CHANGES AT TARAKANDI. WRITE REPORTS.
87 M 13 12:00+ NO DAILY NOTES FOR 13TH TO 18TH. WROTE OUT LOG FROM MEMORY ON 18TH. ALL DAYS AT LEAST 10 HRS.
88 T 14 12:00+ MET AT TITAS ENGINEERING OFFICE WITH MR. CHAKMA AND OTHERS RE ADDED SIGNALS AT TARAKANDI. TOMORROW TO TARAKANDI
PM - CONTINUE REQUESTED MODIFICATIONS AND MODULE REPAIRS
89 W 15 14:00+ TARAKANDI- (4 HR DRIVE!)
TOOK YOUNG TITAS ENGINEER IN CHARGE OF THE SIGNAL INPUTS. SHAHINUL ISLAM, SHAHADAD HOSSAIN AND THE TWX TECHNICIAN, MR. JUHUNGI
JUHUNGI CONNECTED INPUTS TO TELEMETRY PANEL. ADJUSTED STRAPPING ON ALARM CARDS TO ACCOMODATE VARIOUS NO AND NC SIGNALS. (I SHOWED MR JUHUNGI HOW TO "PIGTALE" POWER TO INPUT PANEL AND SUPPLIED WIRE NUTS FOR THAT PURPOSE. NO PREVIOUS AC EXPERIENCE!
90 T 16 14.00+ TARAKANDI- (YET AGAIN!)
JUHUNGI CONTINUED REPAIRS. WITHOUT CONSULTING ME, SHAHINUL ISLAM TURNED ON POWER TO INPUT PANEL. SEVERAL FIELD DIVICES WERE NOT CONNECTED AND SO WENT INTO ALARM. THERE WAS CONFUSION RE WHICH SIGNALS WERE ACTUALLY IN USE AND WHICH WERE NOT. TITAS EMPLOYEES HAD SOME DISCUSSION ON THE MATTER.
91 F 17 12.00+ TARAKANDI- (YET AGAIN!)
RETURNED AGAIN WITH JUST MR. JUHUNGI TO WORK ON THE RADIO. WITHOUT THE INTERFERANCE OF THE TITAS ENGINEERS WE FIXED TX AND RX FROM BRIDGE. ALSO, PIN ON BRIDGE BROKEN. FIXED AND RETWISTED WIRE OVER PIN (TWX HAD NO WIRE WRAP TOOL. ALL WORK DONE WITH PLYERS. WITH J/H GIVING DIRECTIONS ON RADIO PHONE.) VERIFIED RADIOS WORKING. NO CONSENSUS @ TWX REGARDING WHICH SIGNALS TO CONNECT.
(ARRIVED IN DHAKA ABOUT 9:30 AND WENT STRAIGHT TO SHAHIN'S WEDDING. MISSED THE CEREMONY BUT MADE THE RECEPTION - WHICH WENT ON FOR AT LEAST 3 MORE DAYS.
92 S 18 10.00+ TWX OFFICE - WHILE WAITING FOR OTHERS TO ARRIVE, LOOKED IN "BACK ROOM" FOR BOXES TO USE FOR PACKING & LOCATED THE MISSING ASTs.
INVENTORIED THE PREVIOUSLY UNDISCOVERED PARTS - RONAN, MOSLEY, AND TELEPRODUCTS. (TWX WAS UPSET THAT I HAD SNOOPED. BUT, THEY COULDN'T COMPLAIN TOO MUCH. ALSO FOUND SOME SECURITY WANDS THEY HAD ORDERED FOR THE GOVERNMENT AND WHICH HAD GONE MISSING. SUSPECT THAT THESE ITEMS WERE INTENDED FOR EVENTUAL RESALE "OFF THE BOOKS".)
93 S 19 10.00 TRISHAL -
RAN COMMON WIRE AND KEY WIRE TO RADIO. TEST RADIO.
AT DIRECTION OF MR. HAMDANI, KEYED RADIO MANUALLY AND TURNED ON CONSTANT CARRIER FROM RTU. ADJUSTED LEVELS PER MR HAMDANI'S DIRECTION. AFTER SOME TIME COMMUNICATION WITH DHAKA WAS ESTABLISHED.
MOVED TO SONARGAON HOTEL IN PM. BEGAN INVENTORY.
94 M 20 14.00 JAMALPUR -
JURY-RIGGED CABLE FROM RADIO COMMON TO RADIO GROUND AND RE-RIGGED RADIO KEY LINE.
SOLDERED DELAY DIODES INTO RTU AT S97, 96, AND 95.
TURNED ON RTU CONSTANT CARRIER.
COULD NOT COMMUNICATE WITH DHAKA UNTIL ABOUT 2:30 P.M.
NO CARRIER FROM TARAKANDI. NO POWER AT TARAKANDI. J/H DIRECTED THEM TO ENGAGE GENERATOR.
TARAKANDI TURNED ON. CARRIER CAME IN VERY DIRTY ON SCOPE WITH AN OVERLAYING BEEP FROM THE BATTERY ALARM - NO AC, OPERATING ON BATTERY POWER ONLY. RTU RESPONDING ABOUT EVERY 4TH TIME
CARRIER BEGAN TO "COME AND GO", JUST BEFORE IT DIED THERE WAS A SPIKE ON SCOPE.
JUMPERED KEY ON AT RADIO PER J.H. - NO CHANGE.
AT MR. HAMDANI'S DIRECTION, REMOVED YELLOW WIRE FROM PS TERMINAL BLOCK ON THE VHF RADIO, F3. PS BEEP GONE. SINE WAVE FROM MTU REGULAR, RTU RESPONDS EVERY TIME.
REMOVED RADIO KEY JUMPER, WATCHED RTU CONTINUE TO RESPOND EVERY TIME. WHILE OBSERVING THE SINE WAVE FROM THE MTU, IT WENT FLAT.
AT MR. HAMDANI'S DIRECTION, ATTEMPTED TO COMMUNICATE WITH TARAKANDI BY VOICE OVER RADIO F3. NO ONE RESPONDED, ALTHOUGH I COULD HEAR THE REPEATER KEY OCCASIONALLY.
WAITED FOR DHAKA TO MAKE ADJUSTMENTS. AFTER SOME TIME, SINE WAVE REAPPEARED, ALTHOUGH MORE RAGGED THAN BEFORE.
SINE WAVE DISAPPEARED, SIGNAL FLAT. REAPPEARED, WENT FLAT - REPEATED SEVERAL TIMES - WENT FLAT AND DID NOT RETURN. TRIED TO GIVE MR. HAMDANI A BLOW BY BLOW DESCRIPTION BUT ALL HE SAID WAS "CALM DOWN". HE INFORMED ME THAT THE RADIO WAS WORKING. NOT CLEAR WHERE HE RECEIVED HIS INFORMATION.
VERIFIED THAT BATTERY "BEEP" WIRE NOT TOUCHING ANYTHING. IT WAS NOT.
LARRY MEDLIN CALLED ON F2. AFTER SOME ADJUSTMENT, STEADY SINE WAVE AND MTU CAME THROUGH CLEARLY. FSK FROM MTU CLEAR, AND RESPONSE FROM RTU CLEAR.
LARRY LEFT TARAKANDI TO RETURN TO DHAKA. ABOUT 15 MINUTES LATER, THE RADIO FAILED AGAIN AND THE DIRTY SINE WAVE APPEARED AGAIN, THEN WENT FLAT.
NO ONE AT DHAKA OR AT TARAKANDI RESPONDED.
MR. JUHUNGI WIRED ANNUNCIATOR PANEL TO THE INPUT PANEL. TESTED STRAPPING AND ADJUSTED AS NEEDED.
#6 DOES NOT CHANGE STATE - ALWAYS IN ALARM. WHEN LIFT WIRE FROM INPUT PANEL, IT WORKS FINE.
#8 LIKEWISE.
TWX WILL NEED TO CHECK WIRING ON INPUT PANEL.
95 T 21 12.00 AM - BHALUKA - FINAL DEMO - NO POWER. BATTERIES DEAD. GENERATOR STOLEN. J/H VERY TESTY. TITAS REPS, GOVERNMENT REPS, AND TWX ENGINEERS SUCRRYING ABOUT TRYING TO GET POWER. I WENT IN GUARDROOM TO STAY OUT OF THE WAY. AFTER ABOUT 2 HOURS TITAS ENGINEER FOUND OUT THAT THE NATIONAL ELECTRIC COMPANY HAD TURNED OFF TITAS POWER FOR NON PAYMENT.
BACK TO TITAS WITH J/H THEN TO SONARGAON
CONFIGURE REPAIRS, WORK WITH WKD ON EQUIP INVENTROY. ARRANGE TO RETURN ON 23RD.
96 W 22 10.00 INVENTORY CHECK.
PICK UP ITEMS STORED AT GUEST HOUSE AND REVIEW DATA PATH.
PROOF READ CONFIGURATION CHANGES REQUESTED BY CUSTOMER.
WRITE DIRECTIONS FOR TWX REGARDING INVENTORY AND WHAT IS NECESSARY TO CORRECT CONNECTIONS - I.E. REPLACING 4 WIRE CABLES AT VHF SITES WITH 6 WIRE CABLES AND CONNECTIONS.
NOTES ON INPUTPANEL PROBLEMS.
PACK.
97 T 23 8:00 PREPARED MATERIALS TO TURN OVER TO TWX. TWX SCHEDULED TO COME AT 8:30 TO TRANSPORT EQUIPMENT TO TITAS GAS OFFICE. SHOWED UP AT 11:00. TURNED EQUIPMENT OVER TO MR. NASIM AND MR. JUHUNGI. DROVE TO AIRPORT WITH WKD NASIM & JUHUNGI - AND DEPARTED
98 F 24 16:00 RETURN TO LA, CROSSING DATE LINE. TURNED IN EQUIP AT RONAN AND REPORTED.